Copied to clipboard

Flag this post as spam?

This post will be reported to the moderators as potential spam to be looked at


  • James Allgood 2 posts 22 karma points
    Aug 11, 2012 @ 23:21
    James Allgood
    0

    Moving templates, macros, doctypes from Staging to Production

    I am able to move my content on Umbraco 4.x using Courier 1.3 to my Production server. Unfortunately the templates I created are not able to be transferred through Courier. Is creating a package on Stage and uploading it to Production the only way to move these assets to the live server? I am finding that my package upload is timing out because of the size.

  • Jeroen Breuer 4908 posts 12265 karma points MVP 5x admin c-trib
    Aug 13, 2012 @ 12:00
    Jeroen Breuer
    0

    What version of Umbraco are you using? Courier 1.3 is pretty old and currently 2.7 is already out which should support it, but it's only 4.5+ I think.

    Jeroen

  • James Allgood 2 posts 22 karma points
    Aug 13, 2012 @ 18:02
    James Allgood
    0

    It is umbraco v 4.5.2. How do you move the templates without upgrading?

Please Sign in or register to post replies

Write your reply to:

Draft