I am able to move my content on Umbraco 4.x using Courier 1.3 to my Production server. Unfortunately the templates I created are not able to be transferred through Courier. Is creating a package on Stage and uploading it to Production the only way to move these assets to the live server? I am finding that my package upload is timing out because of the size.
Moving templates, macros, doctypes from Staging to Production
I am able to move my content on Umbraco 4.x using Courier 1.3 to my Production server. Unfortunately the templates I created are not able to be transferred through Courier. Is creating a package on Stage and uploading it to Production the only way to move these assets to the live server? I am finding that my package upload is timing out because of the size.
What version of Umbraco are you using? Courier 1.3 is pretty old and currently 2.7 is already out which should support it, but it's only 4.5+ I think.
Jeroen
It is umbraco v 4.5.2. How do you move the templates without upgrading?
is working on a reply...