Copied to clipboard

Flag this post as spam?

This post will be reported to the moderators as potential spam to be looked at


  • Per Ploug 865 posts 3491 karma points MVP admin
    Nov 27, 2012 @ 14:21
    Per Ploug
    0

    Last step before final release

    So, I've posted a couple of RC proposals for Courier 2.7.3 but a couple of show stoppers have appeared in the last minute, these were:

    - Log4net dll inclusion incompatible
    - Dependence on .net 4.5 due to build server upgrade
    - Licensing breaking due to change in httpcontext availability

    these have been fixed now, but it also means that courier would need an additional round of testing and prepping for release to ensure we didn't introduce any new issues by doing these changes, so hopefully this is the very last RC before releasing.

    Again, thanks very much for all the testing and feedback, I know its a lot of work to do these tests and can be frustrating to see issues at this stage, but Courier can be a very large and complex beast to work with, because of the many environments it has to work in.

    So, hopefully, final RC is 2.7.3.31:

    Package: http://nightly.umbraco.org/UmbracoCourier/2.7.3/nightly%20builds/Courier_2.7.3_2.7.3.31.zip

    Zip: http://nightly.umbraco.org/UmbracoCourier/2.7.3/nightly%20builds/Courier_2.7.3_2.7.3.31_hotfix.zip

    /per

Please Sign in or register to post replies

Write your reply to:

Draft