Copied to clipboard

Flag this post as spam?

This post will be reported to the moderators as potential spam to be looked at


  • stephencai 21 posts 131 karma points
    Aug 02, 2019 @ 09:24
    stephencai
    0

    I am preparing an endpoint for umbraco schedule with short interval time. The function is creating some item in umbraco. I am facing a problem of duplication of item creation.

    How can I set a "lock" to make sure the current schedule have been done before a new schedule start again?

    Any advise?

Please Sign in or register to post replies

Write your reply to:

Draft